Placeholder canvas

The all new Delhi Metro, find out all the routes and features

Date:

Phase IV of the Delhi Metro to get a big infrastructural boost in Delhi-NCR. In order to save time in the much-delayed Phase IV project of the Delhi Metro Rail Corporation (DMRC), it is now going to extensively use a utilize improved civil technology that has only been used on a few occasions previously.

DMRC has floated tenders for the design and construction of several aspects that will form part of the Delhi Metro Phase IV corridors.

The three corridors approved under Delhi Metro Phase IV are as follows:

  • The Tughlakabad-Aerocity corridor, 20.20 km long, will open 15 new metro stations
  • The Janakpuri (west)-RK Ashram corridor, 28.92 km long, on the Magenta Line, will open 25 new metro stations
  • The Mukundpur-Maujpur section, 12.54 km long, on the Pink Line, will open six new metro stations

ALSO READ: Hyderabad: RPF constable saves life of train passenger

For Phase IV, DMRC has floated tenders for the elevated section of the Tughlakabad-Aerocity corridor. Here are the details:

  • Four elevated stations proposed on this corridor namely Sangam Vihar, Khanpur, Ambedkar Nagar and Saket G.
  • The Saket-G station will be constructed as an interchange station between Aerocity-Tughlakabad corridor and Lajpat Nagar-Saket G corridor
  • On the Aerocity-Tughlakabad Corridor, a six-lane flyover along with Delhi Metro corridor is being planned on the M B Road. On this section, a viaduct will be constructed on the upper deck at an elevation of 18 metres, while the road flyover will be on the lower deck at a height of 9.3 metres
  • The total length of the proposed integrated structure will be 2.4 km approximately providing a three-layer transport facility on this section.
  • The flyover will start just after the proposed Sangam Vihar Metro station and will end after Ambedkar Nagar Metro station. It will also provide connectivity from M.B. road to the BRT corridor.
  • A 430-metre six-lane underpass will also be constructed at Saket-G at Mandir marg crossing. This type of construction will come up for the first time in the national capital.
  • DMRC will also construct a double-decker viaduct on the Majlis Park – Maujpur corridor between the Bhajanpura and Yamuna Vihar station. The length of this double-decker viaduct will be around 1.4 km and will be on the central verge of the road.
  • DMRC has floated the civil tenders for the entire 12.58 km long Majlis Park – Maujpur Metro corridor. This will be the first double-decker viaduct to be constructed in Delhi and the Delhi Metro network.

Click here for Latest News updates and viral videos on our AI-powered smart news

For viral videos and Latest trends subscribe to NewsMobile YouTube Channel and Follow us on Instagram

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

Rahul Gandhi Files Nomination From Raebareli

Raebareli: Congress leader Rahul Gandhi filed his nomination from...

Fact Check: Viral Clip Of Meat Shop Running Under Temple Is From Pakistan, Not Kerala

A video surfaced on social media claiming that a...

NewsMobile Morning Brief

Rahul Gandhi To Contest From Rae Bareli; Congress Fields...

Biden’s ‘Election Potshot’ At Key India And Japan Will Not Impact Ties

The President said " This election is about freedom, America and democracy. That’s why I badly need you. You know, one of the reasons why our economy is growing is because of you and many others. Why? Because we welcome immigrants"