Placeholder canvas

In Pics: Chennai Airport’s New Integrated Airport Terminal

Date:

Chennai: Prime Minister Narendra Modi will inaugurate the newly integrated terminal building of the Chennai Airport on Saturday.

The cost of the new terminal building amounts to ₹1,260 crores, with designs inspired by the roots of Tamil culture.

Image Source: Twitter

According to the civil aviation ministry, the “new integrated terminal building at Chennai Airport, spanning an area of 2,20,972 sqm., is set to cater to the growing air traffic in the state of Tamil Nadu.”

Glimpse of the new Terminal

The ministry added that “With the annual passenger handling capacity of 35 Million passengers per annum, the modern facility at the Chennai Airport will improve air travel experiences for all.”

Newly built conveyor belt rows inside the terminal building

Prime Minister Narendra Modi took to Twitter and added “This will be an important addition to Chennai’s infrastructure. It will boost connectivity and also benefit the local economy.”

According to reports, the T-2 (Phase-1) building at the Chennai Airport will increase the passenger handling capacity.

Click here for Latest News updates and viral videos on our AI-powered smart news

For viral videos and Latest trends subscribe to NewsMobile YouTube Channel and Follow us on Instagram

 

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

AstraZeneca Withdraws COVID-19 Vaccine Globally Following Rare Side Effect Concerns: Report

Cambridge: Pharmaceutical giant AstraZeneca has announced the worldwide withdrawal...

NewsMobile Morning Brief

Lok Sabha Polls: Phase 3 Records 63.47% Voter Turnout...

Lok Sabha Polls: Phase 3 Records 63.47% Voter Turnout | TOP UPDATES

New Delhi: The third phase of the 18th Lok...

IPL 2024: Khaleel, Mukesh, Kuldeep Shine As DC Win By 20 Runs Against RR

New Delhi: Khaleel Ahmed, Kuldeep Yadav, and Mukesh Kumar...