skip to content

Now cut your travel from Noida to Gurgaon by 30 min on Magenta Line

Date:

The longest section of the Delhi metro’s magenta line from Janakpuri West to Kalkaji Mandir was formally flagged off today. This 25.6 kilometres long section was inaugurated by the Union Minister for Housing and Urban Affairs (Independent Charge), Hardeep Singh Puri and Delhi Chief Minister Arvind Kejriwal.

This new section, called the Magenta Line, will cut the travel time from Noida to Gurgaon by 30 minutes.

Passenger services will begin from Tuesday (May 29) from 6 AM, from the Kalkaji Mandir and Janakpuri West stations simultaneously.

ALSO READ: Delhi Metro’s Pink Line introduced, removes North-South divide

The Janakpuri West – Kalkaji Mandir section, comprising of 16 stations, will be the longest opened so far in Delhi Metro’s Phase 3, as per the release.

With the opening of this stretch, the entire 38.2 kilometre long Janakpuri West – Botanical Garden Magenta corridor covering the city’s arterial Outer Ring Road will become operational.

Main highlights:

  • Two new interchange facilities that at Janakpuri West (with the Dwarka – NOIDA/ Vaishali Blue Line) and Hauz Khas (with the HUDA City Centre – Samaypur Badli Yellow line).
  • Domestic terminals of the Indira Gandhi International Airport will also get directly connected by the Metro.

ALSO READ: Rahul ‘pokes’ BJP’s social media team with this tweet

  • Commuters travelling from Gurugram will be able to change trains at Hauz Khas to reach south Delhi and NOIDA.
  • Residents of NOIDA will also get direct connectivity to the domestic terminal of the airport
  • The stations on this corridor are: Janakpuri West, Dabri Mor, Dashrathpuri, Palam, Sadar Bazar, Terminal 1 – IGI Airport, Shankar Vihar, Vasant Vihar, Munirka, RK Puram, Hauz Khas, IIT, Panchsheel Park, Chirag Delhi, GK Enclave, Nehru Enclave.

With the magenta line the entire Delhi Metro corridor will expand to 278 kilometres with 202 stations. After the opening of this section, 88 kilometres of Phase 3 corridors have been completed and another 72 kilometres are in the final stages of completion.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

Fact Check: Video of Overcrowded Train From Bangladesh Misleadingly Claimed As That From India

A video depicting an overcrowded train has recently gone...

Pune Accident: Teen, Father Claim Driver Was Behind The Wheel During The Crash

The accused is the son of a real estate developer Vishal Agarwal, who was in the car which crashed into the motorbike killing two people

“Never Question That”: Graeme Swann Backs India’s Decision To Pick Four Spinners For T20 WC

During the press conference earlier this month, India skipper Rohit Sharma revealed that he wanted four spinners in the squad for the highly-anticipated tournament

CSK CEO Kasi Viswanathan Drops Major Hint On Franchise Icon MS Dhoni’s Retirement Plans

CSK CEO gave his take on what the future holds for the veteran wicketkeeper. He stated that he is unaware of Dhoni's decision but remains hopeful to see the star player in the next season